久久婷婷国产一区二区三区,国产成人精品日本亚洲专区6,91在线激情在线观看,欧美办公室丝袜性受

  Homepage      Favorite      中文版
Home About Us News info Products Services Recruitment Contact us
SERVICES
Marketing
After Services
Question
Downloads
CONTACT US
Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
Tel: +86-592-6539999
E-mail: bussiness@xmzzj.com

Question
Location:Home → Services → Question
Regular maintenance loaders
Public date:2015-1-21   Hits:16945

Maintenance intervals are listed in this manual or the use of work time table calendar (day, week, month, etc.) to determine. OOK company shall be required to maintain the two time periods of work time due to first. Under extremely harsh, dusty or humid environment, the need for more than "regular maintenance" in the provisions of the more frequent lubrication and maintenance. When maintenance, should be repeated to maintain the requirements listed in the original project. For example, during the three months of every 500 operating hours or maintenance project should be carried out at the same time every 250 operating hours or a month, every 100 operating hours or two weeks, or every week, and every 10 working hours or every 50 hours of work the maintenance items listed daily.

* Every 10 hours, or a day of maintenance work
* Every 50 hours or weekly maintenance work
* Every 100 operating hours or two weeks of maintenance
* Every 250 operating hours or one month of maintenance
* Every 500 operating hours or three months of maintenance
* Maintenance every 1000 operating hours or six months
* Every 2000 operating hours or yearly maintenance

Parts periodic maintenance table

Parts
Name

Inspection and maintenance of content

Interval(h)

10

50

100

250

500

1000

2000

Engine

Replace the engine oil (at least annually)

 

 

Pumps (lubrication by grease cup)

 

 

Replace the oil filter

 

Each time you replace the engine oil

Check and adjust valve clearance

 

 

 

Check the nozzle opening pressure

 

 

 

 

 

 

Replace the fuel filter

 

 

 

Coarse filter to clean the fuel pump

 

 

 

 

 

 

Check the coolant and add enough capacity

 

 

 

 

 

 

Replacing the coolant

Every 12 months

Fastening cooling circuit pipe clamps

 

 

 

 

 

 

Fastening inlet pipe, hose and flange connections

 

 

 

Check the air filter maintenance indicator

 

 

 

 

 

 

Cleaning the air filter dust cup (not including the automatic dust type)

 

 

 

Clean air filter main filter

When the indicator light

Replace the air filter main filter

 

 

 

 

 

 

Replace the air filter safety cartridge

Washed five times after the main filter

Check the V-belt tightening

 

 

Check the turbocharger bearing clearance

 

 

 

 

 

 

To check the fuel pump dedicated service point

 

 

 

 

 

 

Adjust the idle speed

 

 

 

 

 

 

Check engine dampers

 

 

 

 

 

 

Torque Converter
/
Transmission

Check the transmission oil level

 

 

 

 

 

 

Brake shoe clearance between the brake drum and check the parking brake, and then make adjustments as inappropriate

 

 

 

 

 

Tighten all bolts shaft

 

 

 

 

 

 

Cleaning the gearbox oil filter

 

 

 

 

 

 

Replace the oil filter

 

 

 

 

 

 

Replace the gearbox oil

 

 

 

 

 

Replace the coolant, coolant filter, cleaning the cooling system

 

 

 

 

 

 

Check the tightening torque of the gearbox and engine mounting bolts

 

 

 

 

 

 

Hydraulic Tank

Check hydraulic oil level

 

 

 

 

 

 

Clean up the hydraulic system back to the oil filter cartridge

 

 

 

 

 

 

Replace the hydraulic system back to the oil filter cartridge and replace hydraulic oil

 

 

 

 

 

 

Cleaning the tank, check the suction tube

 

 

 

 

 

 

Diesel tank

Check the oil level diesel

 

 

 

 

 

 

Diesel fuel tank cleaning strainer

 

 

 

 

 

 

Fuel tank cleaning

 

 

 

 

 

 

Tire

Check the tire pressure and damage

 

 

 

 

 

 

Check the tightening torque of the wheel rim bolts

 

 

 

 

 

 

Battery

Keep the battery terminals clean and coated with petroleum jelly to prevent corrosion of mist on the terminal

 

 

 

 

 

 

Tighten all bolts batteries, clean the battery top

 

 

 

 

 

 

Drive axle

Replace the drive axle gear oil

 

 

 

 

 

 

Check the front and rear axle oil level

 

 

 

 

 

 

Other Parts

Lubrication to all parts of the grease fitting

 

 

 

 

 

 

Check the working conditions and instrument lighting

 

 

 

 

 

 

Check the oil level in the brake booster

 

 

 

 

 

 

Inspection equipment before and after each frame welds and bolts stress cracks and loose

 

 

 

 

 

 

The ability to detect and parking brake braking capacity

 

 

 

 

 

 

Front and rear axle and the frame fastening bolts

 

 

 

 

 

 

Check the frame hinge pin fixing bolts are loose

 

 

 

 

 

 

Check the brake system and parking brake system work, demolition inspection friction plates for wear, if necessary

 

 

 

 

 

 

By measuring the amount of natural sedimentation cylinder, check valve and work allocation cylinder seal

 

 

 

 

 

 

Check the steering system flexibility

 

 

 

 

 

 

The concentration of antifreeze and coolant additive concentration tank inspection

 

 

 

 

 

 

Note: ▲ - normal working hours; ● - the first time.

Previous  |  Next  |   Return to
About Us
Company profile
Culture
Organizational
Development
Subsidiaries
Certificates
Products
Wheel Loader
Block Handling Wheel Loader
Excavator
Other
Spare Parts
News
Company News
Trade News
Exhibitions
Videos
Services
Marketing
After Services
Question
Downloads
Recruitment
Talent Concept
Jobs
Contact Us
Feedback
Contact us
Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
Two-dimensional [Close]

點(diǎn)擊這里給我發(fā)消息
點(diǎn)擊這里給我發(fā)消息